Unit testing an assembly rule change for a document
- Before promoting the changed content into the testing Expere Knowledge Base a baseline PDF needs to be savedLoad the Expere Testing System.
- <http://{serverName}:{portNumber}/ExpereTestingSystem/index.jsp>
- Click the Assembly link.
- Select appropriate precedence level from the Precedence combo box.
- Click the Document(s) Browse button, find the correct folder and select the document(s) that will be affected by the new assembly rule.
- Click the checkbox next to the desired file. Click the OK button.
- Click the Document DDR button.
- Enter data in applicable fields.
- Click the Store Session Data button to store the transaction data.
- Select Single PDF from the Assembly Options combo box.
- Click the Assemble button.
- Click check box next to the assembled document.
- Click Save Baseline – this is the baseline PDF.
- Repeat Steps 2-11.
- Click Save Target – this is the target PDF.
- Browse baseline set and find the baseline PDF.
- Click the check box next to the PDF file.
- Click OK.
- Browse target set and find the target PDF.
- Click the check box next to the PDF file.
- Click OK.